Skip to main content

High-rise Heuwaage Basel

A bird’s eye view of the project launch

 

Identified task to streamline and remove repetitions

The start of the Hochhaus Heuwaage Basel project marks the beginning of something special. For the next five years, I will be following the development of this building with my camera, from the initial construction phase through to completion, captured in a series of blog posts.

It starts with a flight over the construction site. I took the first shots with the drone and saw just how big this project really is. From above, the scale is immediately visible, the site, the surrounding city and the empty space that will be transformed into a striking high-rise in a few years’ time.

This perspective is unique. There are still no walls, no floors, no roof. This is precisely why these first pictures are so valuable, they show the zero point, the beginning of something big.

 

I am looking forward to everything that is yet to come. Over the next few years, I will be on site regularly to capture every important milestone photographically and on video. Drone shots, interior shots, crane assembly, shell construction, façade and finally the completion.

If you would also like to have this project photographed, please get in touch with me.

High-rise building Heuwaage Basel, first insights into the interior

The Heuwaage Basel high-rise building before the major transformation. Before the conversion work begins, I had the opportunity to document the entire building from the inside. Entrance, stairwells, corridors, empty apartments, kitchens, bathrooms, utility rooms, cellar, roof terrace and the façade from the outside.

Every corner tells a story. You can see how the building has lived and worked over the decades. These photographs are a document of the before, before everything became new.

Over the next five years, I will continue to accompany this project with my camera and record every milestone.

 

Heuwaage high-rise in Basel, the crane assembly

A crane on a construction site is more than just technology. It is a signal that the project is picking up speed. On behalf of Adimmo AG, the assignment was clear: document the entire crane assembly process from 11.00 a.m., with an interim status every two hours until around 8.00 p.m. in the evening.

What unfolded over the course of the day was impressive. The Musfeld team had precisely assembled large components and the crane grew meter by meter into the Basel sky. The fitters worked with concentration and routine, every move was perfect. The regular shots taken every two hours created a visual timeline showing the entire progress of this long working day.

The next day I came back for the final shots. The Musfeld crane was fully assembled on the construction site, ready for the next phase of the Adimmo AG project. A striking moment in the history of the Heuwaage high-rise.

Further information on the project: www.hochhaus-heuwaage.ch

Heuwaage High-Rise in Basel: The Demolition Work

After getting our first glimpse inside, the next major step came this summer: demolition. What had stood there for decades is now being torn down piece by piece to make way for the new high-rise. As part of the construction documentation project commissioned by Adimmo AG, I was on site regularly to document this transformation.

Demolition has a dynamic all its own. Excavators equipped with demolition grapples are working their way through the floors, dust fills the air, and the site’s appearance changes with each passing day. What was still a facade yesterday is now an open space offering a view into the interior of the building. This phase vividly demonstrates just how much power and precision a controlled demolition in the heart of the city requires.

It is precisely these moments that make a construction documentary so valuable. They capture a state that will never return and continue to tell the story of the place, from the first drone footage to the interior shots and on to the demolition.

Heuwaage High-Rise in Basel: Demolition Is Complete

The time has finally come: The building has been completely demolished. Where the old high-rise stood just a few months ago, there is now an open space, ready for the new construction. This moment marks the end of an era and, at the same time, the true new beginning of Adimmo AG’s project.

The transformation is most clearly visible from above. The site once again appears as an open space, much like it did at the very beginning of the documentary, except that now all preparations for the upcoming high-rise have been completed. The drone footage places the ground-breaking and the completed demolition side by side, making the enormous progress tangible.

For me, this marks the end of an important phase in this five-year project. The next step is the excavation and the start of the structural work, and I’ll be documenting these phases as well with my camera and drone.

WhatsApp schreiben